Rebates, tax exemptions, performance payments and export compensation serve different purposes. These summaries are a starting point, not approval or an offer of a specific payout. Applicable local utility incentives, ownership rules, equipment requirements, enrollment deadlines and remaining funds will be reviewed before a proposal is finalized.
Active — statewide. As of October 31, 2026, the regular 2026 filing deadline (April 30, 2026) has passed; plan for the 2027 January 1–April 30 window or ask the local appraisal district about any late-filing options.
Texas Solar and Wind-Powered Energy Device Property-Tax Exemption
A statewide property-tax exemption removes the appraised-value increase attributable to a qualifying solar energy device. It is a property-tax exemption, not a point-of-sale rebate or income-tax credit; the Comptroller form defines qualifying solar devices to include equipment that converts, stores, or distributes solar energy for on-site use.
Eligibility: The applicant must own the qualifying real property/device. The solar device must be installed or constructed on the property and primarily produce and distribute energy for on-site use. File Comptroller Form 50-123, with required support such as device/installation information, with the appraisal district in every county where the property is located—not with the Comptroller. The regular filing period is January 1 through April 30 for the requested tax year; once granted, reapplication is generally not annual unless the chief appraiser requires it or the owner adds property.
Active — utility-specific. Austin Energy’s current homeowner program page lists the $4,000 offer; applicants must receive pre-installation confirmation and should verify availability before contracting.
Austin Energy Residential Solar Rebate
Austin Energy offers a $4,000 rebate for an eligible new home solar project. This is a cash rebate program administered by Austin Energy, not a Texas statewide rebate; the amount increased from $2,500 to $4,000 on July 1, 2026.
Eligibility: Available only to an Austin Energy residential electric-account holder for a system installed at that account’s premise. The system must be new, at least 3 kW DC, mostly free of shading, and installed by an Austin Energy participating contractor. Complete the Solar Rebate Quiz and obtain Austin Energy’s Solar Rebate Confirmation Letter before installation; third-party PPAs are not allowed in the Austin Energy territory.
Active — utility-specific. The 12.89 cents per kWh rate is effective October 1, 2026 and is expressly subject to change.
Austin Energy Value of Solar Bill Credit
Austin Energy credits 100% of metered solar production under its Value of Solar rate. For systems under 1 MW-AC, the currently posted rate is 12.89 cents per kWh, effective October 1, 2026; this is an electric-bill credit, not a cash rebate.
Eligibility: Applies to Austin Energy solar customers with an interconnected on-site system; Austin Energy states that all residential solar systems receive Value of Solar bill credits. Production is metered separately. Credits apply only to electric charges, carry over month to month, and are non-transferable; system sizing should be matched to annual consumption.
Active — utility-specific; CPS Energy says enrollment is offered year-round. The $10 event credit is issued 6–10 weeks after a successfully validated event and CPS Energy may modify or end incentives under its terms.
CPS Energy My Battery Rewards
CPS Energy’s year-round demand-response program pays a $10 electric-bill credit for each successfully validated battery-dispatch event. It is a performance payment for helping reduce grid demand, not an upfront home-battery rebate.
Eligibility: Available only to CPS Energy residential electric customers in its service territory who have an active account, complete CPS Energy’s distributed-generation application and interconnection process, and own/control an installed behind-the-meter battery at the service address. CPS Energy notifies participants by email, phone, and text; participation in an event is voluntary, and a credit requires validated demand savings.